Summer Maintenance Responsibilities:
The transition from Spring to Summer Maintenance is usually accomplished by the middle of May. The following are our major summer operations programs:
Asphalt Repair And Pothole Patching:
Asphalt repair is a very important summer activity.
It consists of crack sealing, Chip Sealing (20 miles per year), skin patching, pothole
patching, major repairs on main, collector and residential streets in the Anchorage Roads & Drainage Service Area (ARDSA).
|

Fig. 1. A Rosco Patcher (Snuffy)
repairing potholes.
|

Fig. 2. Crew placing new concrete
on damaged section of a
sidewalk. |

Fig. 3. Crew edging and finishing
the sidewalk concrete
repair project. |
Repairs and Cleaning of Drainage Structures:
We have over 15,000 storm water drainage structures such as manholes, catch basins and Oil and Grease Separators (OGS). We clean and maintain these structures to meet the requirements of the National Pollutant Discharge Elimination System (NPDES).

Fig. 4. Crew installing a new
storm drainage system
as a replacement for a
failed pipe.
|

Fig. 5. Vactor crew cleaning out an
Oil and Grease Separator
(OGS), within the storm
drainage system, at
Northwood Street and
W.48th Avenue. |
Street Sweeping:
Please click on this link to access our Sweeping Program web page.
Drive carefully and enjoy the
Summer.
|